Hi Gurus,
I have the problem about exchange in original budget (cj30) with object currency in VND. but the co currency is IDR, and t-code OB08. has maintain like below.
1. Exchange Rate
2. Original Budget
- T2XXXX = 100 * 0,47619 = 48.
But if i am insert budget in CJ30 the exchange rate date (01.01.2013) why not the current date or last update (22.11.2013)the exchange rate?
Thank you,
Best Regards